1) conduct the testing using the DIMM telescope;
2) maintenance for CSTAR to resume normal operation;
3) maintenance for Plato power station to resume normal operation;
4)setting up weather station. After testing, data returned back to Australia;
5)testing and maintenance for Gattini to resume normal operation;
6)copies of FTS data;
7)installation testing mirror for film of long-term measurement;
8)snow removel for solar panels;
9)vibration data collection and analysis along the way;